// a href = ./ // St Louis News, Weather, Sports, The Big 550 AM, St Louis Traffic, Breaking News in St Louis

All of the street, bridge and interstate improvements planned for downtown St. Louis are on track to be finished on time.  That was the message from Missouri and Illinois transportation engineers when they briefed the East-West Gateway Council of Governments Wednesday.  

   High water on the Mississippi River has caused some delays for crews building the new River Bridge, but project officials say the work continues and they still expect to finish by early next year.  

   Some of the other projects planned for downtown St. Louis over the next two years include the park that will cap the I-70 depressed lanes, new ramps connecting I-70 and I-55 to the Poplar Street Bridge and a year-long resurfacing project on the MLK bridge.

Published in Around Town

All of the street, bridge and interstate improvements planned for downtown St. Louis are on track to be finished on time.  That was the message from Missouri and Illinois transportation engineers when they briefed the East-West Gateway Council of Governments Wednesday.  

   High water on the Mississippi River has caused some delays for crews building the new River Bridge, but project officials say the work continues and they still expect to finish by early next year.  

   Some of the other projects planned for downtown St. Louis over the next two years include the park that will cap the I-70 depressed lanes, new ramps connecting I-70 and I-55 to the Poplar Street Bridge and a year-long resurfacing project on the MLK bridge.

Published in Local News

   The organization spearheading the effort to revamp the grounds around the Gateway Arch say the project is progressing well.  

   In it's third "report to the community," presented Tuesday night, CityArchRiver detailed MoDOT's construction time line for the planned "lid" over the I-70 depressed section. The agency says construction will begin this summer.  

   The finished "park over the highway" will connect the Arch grounds to downtown St. Louis.  Presenters also thanked the audience for passing Proposition P, a sales tax that will be used to help finance the project.  

   CityArchRiver also released new renderings for the plan to revamp the museum under the Arch.  You can see those images on their website.

Published in Local News
Thursday, 21 February 2013 08:30

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Around Town
Thursday, 21 February 2013 04:34

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Local News

Latest News

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
Prev Next
NO GEM FOR GARCIA AS ROCKIES BEAT CARDINALS 8-2

NO GEM FOR GARCIA AS ROCKIES BEAT CARDINALS 8-2

ST. LOUIS (AP) -- Jaime Garcia got rocked again by Colorado and fell well short of giving the St. Louis Cardinals three straight pitching gems. "I made a couple mistakes and pai...

KTRS Sports: Sources say there are problems in Blues' locker room

KTRS Sports: Sources say there are problems in Blues' l…

After Wednesday night's 3-2 overtime loss to the Kings, KTRS Sports Director John Hadley reports that the Blues are having issues behind the scenes. Obviously, there are issues fo...

KINGS BEAT BLUES 3-2 IN OT, TAKE 3-2 SERIES LEAD

KINGS BEAT BLUES 3-2 IN OT, TAKE 3-2 SERIES LEAD

ST. LOUIS (AP) -- The way the Los Angeles Kings opened the playoffs is old news. The defending Stanley Cup champions are headed home where they've dominated, one win shy of survivi...

Kings have momentum, Blues still have home ice

Kings have momentum, Blues still have home ice

   ST. LOUIS (AP) - The defending Stanley Cup champions looked the part while evening their series against the St. Louis Blues.    The Los Angeles Kings dominated the second half ...

Wood outpitches Lynn in Cubs' win over Cards

Wood outpitches Lynn in Cubs' win over Cards

   CHICAGO (AP) - Travis Wood pitched impressively into the seventh inning to outduel Lance Lynn, Nate Schierholtz hit a two-run homer and the Chicago Cubs snapped the St. Louis Ca...

LA Kings rally late, even series with Blues 4-3

LA Kings rally late, even series with Blues 4-3

   LOS ANGELES (AP) - Anze Kopitar tied it with 12:46 to play, Justin Williams tipped home the go-ahead goal 76 seconds later, and the Los Angeles Kings  evened their first-round s...

GARCIA PITCHES CARDINALS PAST BREWERS 10-1

GARCIA PITCHES CARDINALS PAST BREWERS 10-1

MILWAUKEE (AP) -- Jaime Garcia put the Brewers and St. Louis' sweep of Milwaukee under wraps. He pitched eight innings and Allen Craig drove in four runs to lead the St. Louis C...

LA KINGS' QUICK BLANKS BLUES 1-0

LA KINGS' QUICK BLANKS BLUES 1-0

LOS ANGELES (AP) -- From the opening minutes to St. Louis' final flurries, Jonathan Quick played every puck with the desperate determination necessary to win the Stanley Cup. Ev...

© 2013 KTRS All Rights Reserved

St Louis Web Design