Click for St. Louis, Missouri Forecast

// a href = ./ // St Louis News, Weather, Sports, The Big 550 AM, St Louis Traffic, Breaking News in St Louis

 
 
 

All of the street, bridge and interstate improvements planned for downtown St. Louis are on track to be finished on time.  That was the message from Missouri and Illinois transportation engineers when they briefed the East-West Gateway Council of Governments Wednesday.  

   High water on the Mississippi River has caused some delays for crews building the new River Bridge, but project officials say the work continues and they still expect to finish by early next year.  

   Some of the other projects planned for downtown St. Louis over the next two years include the park that will cap the I-70 depressed lanes, new ramps connecting I-70 and I-55 to the Poplar Street Bridge and a year-long resurfacing project on the MLK bridge.

Published in Around Town

All of the street, bridge and interstate improvements planned for downtown St. Louis are on track to be finished on time.  That was the message from Missouri and Illinois transportation engineers when they briefed the East-West Gateway Council of Governments Wednesday.  

   High water on the Mississippi River has caused some delays for crews building the new River Bridge, but project officials say the work continues and they still expect to finish by early next year.  

   Some of the other projects planned for downtown St. Louis over the next two years include the park that will cap the I-70 depressed lanes, new ramps connecting I-70 and I-55 to the Poplar Street Bridge and a year-long resurfacing project on the MLK bridge.

Published in Local News

   The organization spearheading the effort to revamp the grounds around the Gateway Arch say the project is progressing well.  

   In it's third "report to the community," presented Tuesday night, CityArchRiver detailed MoDOT's construction time line for the planned "lid" over the I-70 depressed section. The agency says construction will begin this summer.  

   The finished "park over the highway" will connect the Arch grounds to downtown St. Louis.  Presenters also thanked the audience for passing Proposition P, a sales tax that will be used to help finance the project.  

   CityArchRiver also released new renderings for the plan to revamp the museum under the Arch.  You can see those images on their website.

Published in Local News
Thursday, 21 February 2013 08:30

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Around Town
Thursday, 21 February 2013 04:34

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Local News

Latest News

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
Prev Next
Wainwright injures knee, Cardinals blank Mets 3-0

Wainwright injures knee, Cardinals blank Mets 3-0

  NEW YORK (AP) -- Adam Wainwright threw seven neat innings before leaving with a knee injury, and Jon Jay hit a two-run single that sent the St. Louis Cardinals to a 3...

Albert Pujols hits 500th HR of major league career

Albert Pujols hits 500th HR of major league career

  WASHINGTON (AP) -- Albert Pujols reached 500 homers in a hurry.   The Los Angeles Angels' first baseman hit a pair of shots off Washington Nationals righ...

Lyons solid in 1st start, Cards blanked by Mets

Lyons solid in 1st start, Cards blanked by Mets

  NEW YORK (AP) -- Tyler Lyons stepped into the St. Louis rotation and looked right at home. Too bad for him, the Cardinals couldn't get anyone home to help him. &n...

Blackhawks blank Blues 2-0 in Game 3

Blackhawks blank Blues 2-0 in Game 3

CHICAGO (AP) -- Corey Crawford made 34 saves in his third career postseason shutout, and the Chicago Blackhawks got back into their playoff series with the St. Louis Blues with ...

Cards defense, bullpen falter in 3-2 loss to Nats

Cards defense, bullpen falter in 3-2 loss to Nats

  WASHINGTON (AP) -- The Cardinals managed to score twice against Stephen Strasburg while starter Shelby Miller kept the Nationals offense quiet. Nine outs away from ta...

Molina's error hurts Cardinals in 3-1 loss to Nats

  WASHINGTON (AP) -- There's a simple reason St. Louis Cardinals pitcher Michael Wacha felt comfortable putting a changeup in the ground with the bases loaded in the se...

Blues beat Blackhawks 4-3 in 3 OTs

Blues beat Blackhawks 4-3 in 3 OTs

ST. LOUIS (AP) -- Alexander Steen scored at 26 seconds of the third overtime to give the St. Louis Blues a 4-3 victory over the defending Stanley Cup champion Chicago Blackhawks...

© 2013 KTRS All Rights Reserved