// a href = ./ // St Louis News, Weather, Sports, The Big 550 AM, St Louis Traffic, Breaking News in St Louis

   The organization spearheading the effort to revamp the grounds around the Gateway Arch say the project is progressing well.  

   In it's third "report to the community," presented Tuesday night, CityArchRiver detailed MoDOT's construction time line for the planned "lid" over the I-70 depressed section. The agency says construction will begin this summer.  

   The finished "park over the highway" will connect the Arch grounds to downtown St. Louis.  Presenters also thanked the audience for passing Proposition P, a sales tax that will be used to help finance the project.  

   CityArchRiver also released new renderings for the plan to revamp the museum under the Arch.  You can see those images on their website.

Published in Local News
Thursday, 21 February 2013 08:30

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Around Town
Thursday, 21 February 2013 04:34

Phase 2 of Arch grounds re-do finds funding

The next phase of the planned improvements to the Arch grounds is set to get underway this summer.

Crews had already planned to begin construction of the "lid" over I-70.

Now, the rebuild of Leonor K. Sullivan Boulevard, which runs along the riverfront at the base of the Arch steps, will also start this year. The road will be elevated and redesigned to include bike paths and pedestrian walkways.

Funding had already been in place for the $47 million park that will cap the highway. Newly found savings from that project will help fund the other.

The St. Louis Post-Dispatch reports that engineers have determined that the concrete walls of the "depressed section" of I-70 don’t need to be replaced, as originally thought. So the $11-million cost savings on that project will fund the Leonor K. Sullivan rebuild.
Published in Local News

Latest News

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
Prev Next
18 mayors ban use of food stamps to buy sugary drinks

18 mayors ban use of food stamps to buy sugary drinks

NEW YORK (AP) - The mayors of New York, Los Angeles, Chicago and 15 other cities are reviving a push against letting government food vouchers be used to buy soda and other sugary d...

Teen charged in fatal hot-and-run accident

Teen charged in fatal hot-and-run accident

Charges are filed against 17-year-old Charles Guice in the hit-and-run that killed a 2-year-old boy. He faces one count of Leaving the Scene of an Accident. On Sunday night, offic...

Bomb threat called in to Afton business

Bomb threat called in to Afton business

A bomb threat has forced the evacuation of an Afton business this afternoon. Fox 2 reports that all employees at Kerry Ingredients were ordered out of the building around 1:30. Th...

Drivers will need to feed meters in downtown St. Louis on Saturdays

Drivers will need to feed meters in downtown St. Louis …

Drivers will soon need to the feed the parking meters in Downtown St. Louis on Saturdays. The Parking Division announced that they will start enforcing expired meters on Saturday ...

Unique part-time jobs available at upcoming job fairs

Unique part-time jobs available at upcoming job fairs

A couple of job fairs coming up that offer unique part-time job opportunities. Peabody Opera House and the Scottrade Center are looking to hire for the upcoming seasons. Positions...

Four shot in north St. Louis county

Four shot in north St. Louis county

Four victims after a shooting in North County today. The incident started at an apartment building just south of 70 in Berkeley. Police say there was an argument between two group...

Local leaders kick off Cool Down St. Louis program

Local leaders kick off Cool Down St. Louis program

Local leaders have put out the call to those in need and to those who can help. Cool Down St. Louis and Ameren kicked off their annual summer program to keep St. Louisans safe fro...

Two suspects sought after shooting at Metrolink station

Two suspects sought after shooting at Metrolink station

Two suspects are on the loose after shooting a man at the Metrolink station in Pagedale. Police say the shooting happened just after noon near St. Charles Rock Road. The suspects ...

© 2013 KTRS All Rights Reserved

St Louis Web Design